Originally Posted by jchammond Hope to have foundation done & concrete poured this month & was told 35days before I can mount lift...so around mid March 35 days is a
|
|
LinkBack | Thread Tools | Display Modes |
![]() |
#11 (permalink) |
A True Z Fanatic
Join Date: Sep 2016
Location: Illinois
Posts: 2,410
Drives: 13 370z 6MT
Rep Power: 2684367 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]()
35 days is a cover thy *** number. You need 27 days to get a "full cure" break. That is the point the mix hits what should be it's min compression. You can install your lift at 7 days with the temps you'll have. You still need to wait 3ish weeks before putting a car on the slab and I'd go a full month before putting the car on the lift but you can have a lot of things ready to go long before you can use the lift.
|
![]() |
Bookmarks |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
The New "What did you do with your Z today" (with off topic replies) Cooking Edition | Leingod | The Lounge (Off Topic) | 319 | 09-28-2021 10:10 PM |
The New "What did you do with your Z today" (with off topic replies) XXIV | JARblue | The Lounge (Off Topic) | 10059 | 08-17-2016 12:08 PM |
The New "What did you do with your Z today" (with off topic replies) XXIII | eastwest2300 | The Lounge (Off Topic) | 10001 | 06-23-2016 09:21 AM |
The New "What did you do with your Z today" (with off topic replies) XXII | eastwest2300 | The Lounge (Off Topic) | 10001 | 04-05-2016 08:15 PM |