![]() |
Originally Posted by Rusty Electric cars are coming faster then what we think. The problems I see for now with the electric car is range, charging time, battery replacement costs,
|
|||||||
![]() |
|
|
LinkBack | Thread Tools | Display Modes |
|
|
|
|
#1 (permalink) | |
|
Base Member
Join Date: Nov 2015
Location: Pueblo CO
Posts: 98
Drives: 12 Nissan 370Z T M6
Rep Power: 11 ![]() |
Quote:
Motor Week showed a battery pak replacement "station" where the vehicle drives over, and is positioned over, a lift that extends up to the battery pack, lowers it below surface, and raises a new fully charged battery pack into place under the car. It worked slick, and was fast. That's one possible solution besides "quick charge" stations that exist now for Tesla vehicles. As far as our power grid not being able to carry the new load, that hasn't stopped our gov't from promoting and subsidizing more wind power generator fields that can't be utilized during peak wind conditions. All because the power grid can't handle it. (I hate looking at those things, they just clutter the view of the countryside IMO. Oh yah, and they kill endangered bird species I think all of the problems you list will be solved. They'll have to be. And Uber and Lyft may take care of the transportation requirements of those who can't afford all the costs of owning a vehicle. Plus, they'll be self driving.....another technology that's coming fast and furious. Its a brave new world. |
|
|
|
|
|
|
#2 (permalink) |
|
A True Z Fanatic
Join Date: Dec 2011
Location: Fayettenam,Pennsyltucky
Age: 70
Posts: 35,581
Drives: 2011 Nismo GM 6M
Rep Power: 2684440 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
With the power grid. The N.I.M.B.Y group. (Not In My Back Yard) Has already shot down over 4 dozen transmission line up-grades, new lines, and sub-stations in the last 10 years that I know of.
Wind and solar depend on gov't subsidies. Without that. They would not be cost efficient. They would operate at a lost. Nuke is the cheapest to produce electric, followed by natural gas, coal. Wind and solar are the most expensive. I seen the truck video. And the comments from the truckers I have talked to. They all wonder if it will go 500,000 miles before needing heavy maintenance. And are scared of what a battery replacement would cost. They seem to think that the truck would be better suited to inter-city delivery then long haul.
__________________
浪人 - 殺し屋 "The Difficult Anytime, The Impossible By Appointment Only" http://www.the370z.com/members-370z-...o-journal.html Last edited by Rusty; 12-19-2017 at 06:47 PM. |
|
|
|
|
|
#3 (permalink) | |
|
Premium Member
![]() Join Date: Nov 2010
Location: South Arkansas
Posts: 8,435
Drives: 2014 Challenger
Rep Power: 324199 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Quote:
Running more long-distance lines is very expensive. In many urban areas, there's not enough room to run more lines. More generating capacity is expensive and takes a long time to build. And then you have to deal with the NIMBYs. My prediction is that much of the recharging power will come from solar panels or other "non-grid" sources. YMMV
__________________
Steering Lock Links - Search The370Z Bookmarklet - FSM @ NICOclub Mankind has progressed past the need for war but we haven't evolved that far. - NachoMahma |
|
|
|
|
|
|
#4 (permalink) |
|
A True Z Fanatic
Join Date: Dec 2011
Location: Fayettenam,Pennsyltucky
Age: 70
Posts: 35,581
Drives: 2011 Nismo GM 6M
Rep Power: 2684440 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
A 600 to 700 MW natural gas combine cycle 2 on 1 (2 gas turbines and 1 steam turbine) power plant takes 18 months to build and costs about $500,000,000 depending on area. They have to be close to water for cooling, gas supply, and grid hook up. Farther away, the higher the cost. If it runs 24/7 at close to max load. It will pay for it's self in about 4 years. Getting permits is another thing. That may take years.
Wind turbines produce about 3 MW's each on a good day (the new ones, 300ft). Cost about $250,000 each. Takes 30 years to pay for it's self. Plus they have to be built where the wind conditions are just right. Low wind will not produce enough electric. Too high of wind will over-speed the turbines, and kill them. When wind speeds are over around 25 mph. They lock the blades in place so that they don't spin, and turn them to a neutral position. So now it's not producing anything. Most of the wind farms are in the mid-west. I'm waiting to see a tornado wipe a farm out. Then see what the experts say.
__________________
浪人 - 殺し屋 "The Difficult Anytime, The Impossible By Appointment Only" http://www.the370z.com/members-370z-...o-journal.html |
|
|
|
|
|
#5 (permalink) | |
|
A True Z Fanatic
Join Date: Oct 2011
Location: Camarillo, CA
Posts: 1,063
Drives: 2011 PW/Grey T/S 7AT
Rep Power: 2808 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Quote:
, Wind power is usually nothing more than a big bird blender. While the turbines have brakes to control the rotor speeds, the systems are a maintenance headache. Let the rotors get out of balance & lose the breaks, look out. I've seen more than one rotor separate from the generator & tower. They are not a consistent source of energy and as mentioned the return on investment blows. You'll be lucky to see a return on investment over the true life of the equipment & taking away subsidies.Oh & back on topic, I kind of wish they would pull the plug on the Z if they have no plans to update anything.
__________________
Semper Fi ![]() Μολὼν λαβέ Last edited by Felix 808; 12-20-2017 at 10:00 AM. |
|
|
|
|
|
|
#6 (permalink) |
|
A True Z Fanatic
![]() Join Date: Mar 2012
Location: FL
Posts: 11,018
Drives: 11 Nissan 370 M6
Rep Power: 1913655 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
having a new model Z would only make it worst the on going depreciation of the 370Z to a level even a 18 year old could afford it.Very sad. But it is what it is. Do we need to close this thread? I think Im still hving fun with an electric Vibrator...massager on my back! |
|
|
|
|
|
#7 (permalink) | |
|
A True Z Fanatic
Join Date: Dec 2011
Location: Fayettenam,Pennsyltucky
Age: 70
Posts: 35,581
Drives: 2011 Nismo GM 6M
Rep Power: 2684440 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Quote:
__________________
浪人 - 殺し屋 "The Difficult Anytime, The Impossible By Appointment Only" http://www.the370z.com/members-370z-...o-journal.html |
|
|
|
|
|
|
#8 (permalink) | |
|
A True Z Fanatic
Join Date: Oct 2011
Location: Camarillo, CA
Posts: 1,063
Drives: 2011 PW/Grey T/S 7AT
Rep Power: 2808 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Quote:
We have (7) 100 KW towers. The funny/ Sad thing is, we don't even have enough load to dump the energy we create & no way to store it. Money well wasted. We got ripped off for sure & suckered into the "Sustainability" B.S.
__________________
Semper Fi ![]() Μολὼν λαβέ |
|
|
|
|
|
|
#9 (permalink) | |
|
A True Z Fanatic
Join Date: Dec 2011
Location: Fayettenam,Pennsyltucky
Age: 70
Posts: 35,581
Drives: 2011 Nismo GM 6M
Rep Power: 2684440 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Quote:
You might as well pull the plug at those prices. Most grid operators give each plant a pre-set load for each hour. You have 10 minutes before and 10 minutes after the hour to match your load schedule. If you are not matching after the 10 minutes. You pay a penalty. If your plant trips off line. You have to buy MW's from another generator at market prices. Hopefully it's not at the 2 peak period times during the day. If it is. You can lose all of your week's profit in a few hours. If it's off peak. You can make money by not running.
__________________
浪人 - 殺し屋 "The Difficult Anytime, The Impossible By Appointment Only" http://www.the370z.com/members-370z-...o-journal.html |
|
|
|
|
|
|
#10 (permalink) | |
|
A True Z Fanatic
Join Date: Dec 2010
Location: Michigan
Posts: 6,365
Drives: 3500 NVP 370Z-sold!
Rep Power: 86625 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Quote:
Why is there not a synchronous inverter to sell it back to the utility? Why is there not a battery bank for storage? You could also dump it into a large insulated water storage tank to offset water heating costs? Or my favorite, Run the excess energy into the largest Tesla coil you can find.
__________________
Get some roosters for eggs and Bulls for milk . Then you will see that gender matters. Especially at milking time. |
|
|
|
|
![]() |
| Bookmarks |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| 2018 's Are Up On Nissan.ca! | Dream Team | Canada | 28 | 07-18-2017 08:34 PM |
| 2018 wrx; | Redglare | Other Vehicles | 40 | 04-22-2017 11:02 PM |
| Audi RS 5 2018/19 | BlackZeda | Other Vehicles | 11 | 03-21-2017 07:46 AM |
| 2018 | HIZZY | Nissan 370Z General Discussions | 31 | 03-21-2017 05:27 AM |
| 2018 Nissan GT-R!!! | UNKNOWN_370 | Other Vehicles | 4 | 03-05-2017 02:10 PM |