Nissan 370Z Forum  

Is Nissan retiring the Z after 2018

Originally Posted by Felix 808 Yep , Wind power is usually nothing more than a big bird blender. While the turbines have brakes to control the rotor speeds, the systems

Go Back   Nissan 370Z Forum > Nissan 370Z General Area > The Lounge (Off Topic)


Like Tree28Likes

Reply
 
LinkBack Thread Tools Display Modes
Old 12-20-2017, 11:39 AM   #1 (permalink)
A True Z Fanatic
 
Rusty's Avatar
 
Join Date: Dec 2011
Location: Fayettenam,Pennsyltucky
Age: 70
Posts: 35,579
Drives: 2011 Nismo GM 6M
Rep Power: 2684440
Rusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond repute
Talking

Quote:
Originally Posted by Felix 808 View Post
Yep , Wind power is usually nothing more than a big bird blender. While the turbines have brakes to control the rotor speeds, the systems are a maintenance headache. Let the rotors get out of balance & lose the breaks, look out. I've seen more than one rotor separate from the generator & tower. They are not a consistent source of energy and as mentioned the return on investment blows. You'll be lucky to see a return on investment over the true life of the equipment & taking away subsidies.

Oh & back on topic, I kind of wish they would pull the plug on the Z if they have no plans to update anything.
Wind turbines are a maintenance headache. They are constantly re-torquing the bolting. I've had a couple of job offers to work at wind farms. Tuned them all down.
__________________

浪人 - 殺し屋
"The Difficult Anytime, The Impossible By Appointment Only"
http://www.the370z.com/members-370z-...o-journal.html
Rusty is offline   Reply With Quote
Old 12-20-2017, 12:42 PM   #2 (permalink)
A True Z Fanatic
 
Felix 808's Avatar
 
Join Date: Oct 2011
Location: Camarillo, CA
Posts: 1,063
Drives: 2011 PW/Grey T/S 7AT
Rep Power: 2808
Felix 808 has a reputation beyond reputeFelix 808 has a reputation beyond reputeFelix 808 has a reputation beyond reputeFelix 808 has a reputation beyond reputeFelix 808 has a reputation beyond reputeFelix 808 has a reputation beyond reputeFelix 808 has a reputation beyond reputeFelix 808 has a reputation beyond reputeFelix 808 has a reputation beyond reputeFelix 808 has a reputation beyond reputeFelix 808 has a reputation beyond repute
Default

Quote:
Originally Posted by Rusty View Post
Wind turbines are a maintenance headache. They are constantly re-torquing the bolting. I've had a couple of job offers to work at wind farms. Tuned them all down.
Yep, I actually oversee the maintenance schedules on a small wind farm.
We have (7) 100 KW towers. The funny/ Sad thing is, we don't even have enough load to dump the energy we create & no way to store it. Money well wasted. We got ripped off for sure & suckered into the "Sustainability" B.S.
Rusty likes this.
__________________
Semper Fi

Μολὼν λαβέ
Felix 808 is offline   Reply With Quote
Old 12-20-2017, 06:04 PM   #3 (permalink)
A True Z Fanatic
 
Rusty's Avatar
 
Join Date: Dec 2011
Location: Fayettenam,Pennsyltucky
Age: 70
Posts: 35,579
Drives: 2011 Nismo GM 6M
Rep Power: 2684440
Rusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond repute
Talking

Quote:
Originally Posted by Felix 808 View Post
Yep, I actually oversee the maintenance schedules on a small wind farm.
We have (7) 100 KW towers. The funny/ Sad thing is, we don't even have enough load to dump the energy we create & no way to store it. Money well wasted. We got ripped off for sure & suckered into the "Sustainability" B.S.
I worked for Duke Energy and Dynegy. As senior CRO at a 2 on 1 combine cycle. Also was the head of maintenance. The plant is in the PJM grid. PJM regulates load by price per MW. So the load is always changing. High price, you go up in load. Low price, you come down in load. I've seen the prices as high as $2,000 per MW. And low as minus $200 MW. You might as well pull the plug at those prices. Most grid operators give each plant a pre-set load for each hour. You have 10 minutes before and 10 minutes after the hour to match your load schedule. If you are not matching after the 10 minutes. You pay a penalty. If your plant trips off line. You have to buy MW's from another generator at market prices. Hopefully it's not at the 2 peak period times during the day. If it is. You can lose all of your week's profit in a few hours. If it's off peak. You can make money by not running.
__________________

浪人 - 殺し屋
"The Difficult Anytime, The Impossible By Appointment Only"
http://www.the370z.com/members-370z-...o-journal.html
Rusty is offline   Reply With Quote
Old 01-24-2018, 04:48 PM   #4 (permalink)
A True Z Fanatic
 
ZeeingAround's Avatar
 
Join Date: Dec 2010
Location: Michigan
Posts: 6,365
Drives: 3500 NVP 370Z-sold!
Rep Power: 86625
ZeeingAround has a reputation beyond reputeZeeingAround has a reputation beyond reputeZeeingAround has a reputation beyond reputeZeeingAround has a reputation beyond reputeZeeingAround has a reputation beyond reputeZeeingAround has a reputation beyond reputeZeeingAround has a reputation beyond reputeZeeingAround has a reputation beyond reputeZeeingAround has a reputation beyond reputeZeeingAround has a reputation beyond reputeZeeingAround has a reputation beyond repute
Default

Quote:
Originally Posted by Felix 808 View Post
Yep, I actually oversee the maintenance schedules on a small wind farm.
We have (7) 100 KW towers. The funny/ Sad thing is, we don't even have enough load to dump the energy we create & no way to store it. Money well wasted. We got ripped off for sure & suckered into the "Sustainability" B.S.
There are several ideas to dump the "waste" energy as you call it.
Why is there not a synchronous inverter to sell it back to the utility?
Why is there not a battery bank for storage?
You could also dump it into a large insulated water storage tank to offset water heating costs?
Or my favorite,
Run the excess energy into the largest Tesla coil you can find.
__________________
Get some roosters for eggs and Bulls for milk . Then you will see that gender matters. Especially at milking time.
ZeeingAround is offline   Reply With Quote
Old 01-24-2018, 06:27 PM   #5 (permalink)
A True Z Fanatic
 
Rusty's Avatar
 
Join Date: Dec 2011
Location: Fayettenam,Pennsyltucky
Age: 70
Posts: 35,579
Drives: 2011 Nismo GM 6M
Rep Power: 2684440
Rusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond reputeRusty has a reputation beyond repute
Talking

Quote:
Originally Posted by ZeeingAround View Post
There are several ideas to dump the "waste" energy as you call it.
Why is there not a synchronous inverter to sell it back to the utility?
Why is there not a battery bank for storage?
You could also dump it into a large insulated water storage tank to offset water heating costs?
Or my favorite,
Run the excess energy into the largest Tesla coil you can find.
1. They don't make enough to sell it to the grid. They might have to buy power from the grid to cover their electric use.
2. You have a battery big enough to handle 700 volts? Duke Energy has been trying to develop a battery storage system for years.
3. Be cheaper to just lock the turbine in place and not spin the blades. If you can make steam. You could sell the steam to some factory. But the problem with that is. Wind farms are far away from anything like that.
4. The Tesla coil. If it's too close. You end up frying your own wind mills.
__________________

浪人 - 殺し屋
"The Difficult Anytime, The Impossible By Appointment Only"
http://www.the370z.com/members-370z-...o-journal.html
Rusty is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
2018 's Are Up On Nissan.ca! Dream Team Canada 28 07-18-2017 08:34 PM
2018 wrx; Redglare Other Vehicles 40 04-22-2017 11:02 PM
Audi RS 5 2018/19 BlackZeda Other Vehicles 11 03-21-2017 07:46 AM
2018 HIZZY Nissan 370Z General Discussions 31 03-21-2017 05:27 AM
2018 Nissan GT-R!!! UNKNOWN_370 Other Vehicles 4 03-05-2017 02:10 PM


All times are GMT -5. The time now is 02:21 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2