![]() |
Originally Posted by stefonelee How long did the kit install take jwick for the bp kit? My buddy and I did it over two weekends. I'd call it 4 days
|
|||||||
|
|
LinkBack | Thread Tools | Display Modes |
|
|
#11 (permalink) |
|
A True Z Fanatic
Join Date: Dec 2010
Location: Houston
Posts: 14,532
Drives: '10 G37 6MT
Rep Power: 2465058 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
My buddy and I did it over two weekends. I'd call it 4 days total. I could of done it faster but I didn't want to rush it. Remember that I was the first to install it on a G so there was some wasted time going back and forth making everything work. I also am the only one I know of that used a remote mount thermostatic filter relocation plate so we had to deal with an extra oil line. That timeline included all the gauges and electrical work too. |
|
|
|
| Bookmarks |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Turbo Build | davidson_z34 | Forced Induction | 33 | 11-12-2015 08:45 PM |
| Need Advice on Bottom End Build | 604GZ | Engine & Drivetrain | 5 | 04-07-2015 10:09 AM |
| Single turbo build | jlask370 | Forced Induction | 13 | 10-07-2013 01:41 PM |
| Need advice on stereo build.... | mengel | Audio & Video | 7 | 02-08-2011 09:24 AM |