2 weeks of labor that takes place over 8-16 months. Note: Its ALWAYS worth buying a spare engine to build, then swapping it over when done. This way you can
|
![]() |
|
LinkBack | Thread Tools | Display Modes |
|
![]() |
#1 (permalink) |
A True Z Fanatic
Join Date: Mar 2009
Location: Chicago
Posts: 3,669
Drives: 370
Rep Power: 974724 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]()
2 weeks of labor that takes place over 8-16 months.
Note: Its ALWAYS worth buying a spare engine to build, then swapping it over when done. This way you can continue to live your normal life with a functioning car (unless you already blew the engine). It is easily worth the cost of the extra engine to spare yourself the stress of a car sitting around in a thousand pieces. Build a spare engine, swap it in over a weekend.
__________________
Last edited by phunk; 05-02-2019 at 03:49 PM. |
![]() |
![]() |
![]() |
Bookmarks |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
[FOR SALE] Complete VQ37VHR motor | Cpt. Obvious | Parts for sale (Private Classifieds) | 0 | 09-08-2017 10:20 PM |
[FOR SALE] 2009 Complete Lift-out motor 70k | gimpy454 | Parts for sale (Private Classifieds) | 4 | 03-04-2016 05:10 AM |
This years build is complete- but what tires to run?? | MUCHA370z | Forced Induction | 9 | 04-03-2015 09:53 AM |
Can I get the complete build details from VIN? | ZeeingAround | Nissan 370Z General Discussions | 5 | 01-18-2011 02:36 PM |
All-motor build? | SE | Intake/Exhaust | 8 | 05-25-2010 07:47 AM |