04-14-2013, 01:08 PM
|
#1 (permalink)
|
|
A True Z Fanatic
Join Date: Aug 2010
Location: Lawrenceville,Ga
Posts: 4,293
Drives: My foot up your azz
Rep Power: 31
|
Quote:
Originally Posted by NickTurnon
Sounds like he is taking the car out for a couple joy rides instead of working on it.
- Front Lip (Paint/Install) Paint 1-2 Days. Install 1 hr.
- Front Hood Scoop (Paint/Install) Paint 1-2 Days. Install 15 Minutes.
- Rear Body Scoops (Paint/Install)Paint 1-2 Days. 1 hr.
- High Wing (Paint/Install)Paint 1-2 Days. Install 2-3 hrs.
- Wheels (Paint)- 1 Day For Paint-30 Minutes For Plasi-dip
- Angel Eye Headlights (Install)Install 2 Hours.
- Taillights (Tint)1-2 Hours
The work if done by one person should only take around two to three business days..
You really aren't getting anything significant done other then paint which takes awhile to dry and the high wing which is a longer install because drilling, etc..
|
I can do all that work in my shop in 1 day.
__________________
2013 ZL1
754 rwhp 747 rwtq
Last edited by Baer383; 04-14-2013 at 01:31 PM.
|
|
|