![]() |
Originally Posted by JARblue My parents' kitchen remodel included installing an I-beam in the ceiling because they discovered the structure supporting bathroom above was not sufficient We removed the wall
|
|||||||
![]() |
|
|
LinkBack | Thread Tools | Display Modes |
|
|
|
|
#1 (permalink) |
|
A True Z Fanatic
Join Date: Dec 2011
Location: Fayettenam,Pennsyltucky
Age: 70
Posts: 35,575
Drives: 2011 Nismo GM 6M
Rep Power: 2684440 ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
We removed the wall between the kitchen and dinner room. We had to put a beam up because the wall was load bearing.
__________________
浪人 - 殺し屋 "The Difficult Anytime, The Impossible By Appointment Only" http://www.the370z.com/members-370z-...o-journal.html |
|
|
|
![]() |
| Bookmarks |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| I Have Parted Ways with My Z | LA370z | Nissan 370Z General Discussions | 30 | 05-23-2016 09:47 PM |
| 4 ways flashing? | Blown32 | Nissan 370Z General Discussions | 12 | 12-15-2009 12:27 PM |