04-14-2020, 09:49 AM
|
#8 (permalink)
|
A True Z Fanatic
Join Date: Feb 2015
Location: In a house
Posts: 4,021
Drives: Z
Rep Power: 502911
|
Quote:
Originally Posted by jchammond
Gonna run OSB vertical on rooftop; so had to install a board beside ridge board w/0.75”gap on each side.
Then installed blocks between purlins at 48” center from 2nd post; I staggered them so I could screw directly into each end, then scabbed the other 2x beside it & toescrewed it on both ends.
Leaving a 3” wide area for where plywood will meet 
Only got 4/more sections to do this way & then it’s plywood time.
Btw, so breezy yesterday; blew my 12’ ladder over
Sent from my iPad using Tapatalk
|
You do all this yourself?  If so, you got serious talent! Quite the architect/carpenter.
__________________
Don't like what I post? Too bad. I really don't give a sh!t
|
|
|