Nissan 370Z Forum

Nissan 370Z Forum (http://www.the370z.com/)
-   Forced Induction (http://www.the370z.com/forced-induction/)
-   -   GTM Performance Engineering: MHI Twin Turbo Official Release (http://www.the370z.com/forced-induction/68491-gtm-performance-engineering-mhi-twin-turbo-official-release.html)

Alkatraz 12-17-2013 07:33 PM

Quote:

Originally Posted by Dzel (Post 2614403)
Good point Al but explain why only a select few are being charged?

Sent with TapAhoe

Becuase they opted for the layaway option and signed a contract stating that they accept a potential restocking fee. Have others who used layaway not been charged the restock fee? If so, that is totally different.

Alkatraz 12-17-2013 07:48 PM

Quote:

Originally Posted by Cell (Post 2614400)
How do you put a product on layaway when it isn't even completed to be shipped out. You NEED to have a finished product to have it on layaway.

If you can show me the US Federal or Califorinia state law that states this, then I will happily agree with you. I am at a disadvantage not being an American but I see no reason why they would have to have the item physically on the shelf in order to arrange a layaway plan. If the seller cant deliver the product by the time that the last payment is made, then they are liable.

fairlady_z34 12-17-2013 07:48 PM

i havent looked at this thread for a few weeks and when i come back its not about turbo kits anymore. looks like a bunch of kids arguing over oreos and cookies now

Mkai0 12-17-2013 07:50 PM

Quote:

Originally Posted by Mkai0 (Post 2614349)
Still waiting for my refund, I'll give an update of how things go. The good news is, I am selling a lot of parts that some of you may be interested in. I'll post them in the for sale section soon.


As promised-

http://www.the370z.com/parts-sale-pr...ml#post2614424

SAM@GTM 12-17-2013 07:54 PM

For starters, it is extremely difficult to give an update on something as complex as a turbo kit. We are dealing with 9 different suppliers to bring this whole thing together. Everything is moving forward, but it is not easy, nor is it simple.

We have 7 all new cast pieces being made for this turbo kit: 3 new turbo manifolds and 4 all new turbine outlets. Most people have no clue how much it costs for mold fees alone for just one cast piece. The mold fees take 100's of units to pay for themselves. Multiply that by 7, and we have a huge capital investment. With this much capital tied up in this venture, there is no reason for us to just run away with people's money.

In fact, we have not required payment to even be on the Group Buy. People have put money down by choice and those that paid in full are entitled to a full refund if they don't want to wait or change their minds. For layaway plans, however, it takes a lot more time and effort to manage and track payments made over a long period of time, and it doesn't necessarily speak to how serious someone is when they only put 20% down on something. People default on loans all the time for various reasons, and something like a layaway plan makes it too easy to pull out of if there is no cancellation clause. Since it requires a signed contract, the person entering the agreement recognizes that there is a penalty for pulling out. In hindsight, I almost feel like we made it far too easy to withdraw from the group buy and we should have taken our competitor's hard line of a non-refundable deposit.

The philosophy behind what we are doing here is not to rip people off, but provide the best possible kit with the best value so that you don't have to spend $10k to get an awesome twin turbo kit for your 370z/G37. We also have 5 different down pipe variations in the works to meet different needs (right hand drive, V-band, standard, catted and non-catted).

Even still, it takes an enormous amount of time and effort to put something of this magnitude together. Add in my recent health issues, and things have become very complicated and even more challenging. Most people that have gone through my surgery would still not be back to work, yet here I am.

As for the frequency of updates, keep in mind with how many vendors are involved with this product, sometimes it takes over a week just for us to get an update from them. Rest assured that we are trying our hardest to wrap this up and put this behind us.

Now, for the "update" part:

Our Mandrel Bender is up and running, but cannot bend the material we had gotten without the material breaking. So, we had to get the material heat treated before we can even bend it. That means working with yet another company that we don't have direct control over. Fortunately, we were able to get the heat treated piping in this afternoon so we can get back to bending pipes. We also discovered that we need more dies to do some of the other pipes as well.

For the cast pieces, we got samples to check and found some inaccuracies with several of them. Those have been fixed and sent back to get redone. This means that the molds had to get re-worked so that the parts will be in spec. That was a few weeks ago and things are back on track.

Sam

BlkNismo 12-17-2013 08:09 PM

Thank you GTM for the long awaited update.

What is your projection of completion date? Summer of 14 or sooner?

Alkatraz 12-17-2013 08:13 PM

Thanks Sam!

I'll stop filling your thread with crap now!

09nismo498 12-17-2013 08:27 PM

Thanks for the update sam!

09nismo498 12-17-2013 08:27 PM

Quote:

Originally Posted by BlkNismo (Post 2614459)
Thank you GTM for the long awaited update.

What is your projection of completion date? Summer of 14 or sooner?

I would really hope its before summer of 2014...

09nismo498 12-17-2013 08:32 PM

Sam- So is everything else done then? Just waiting on bending the pipes, and receiving the cast pieces?

BlkNismo 12-17-2013 08:37 PM

Quote:

Originally Posted by 09nismo498 (Post 2614484)
I would really hope its before summer of 2014...

me too...worst case scenario?

if that was the time frame given, I'd be happier with that then the unknown.

09nismo498 12-17-2013 08:38 PM

If its summer 2014 I may just go buy a gtr lol

Alkatraz 12-17-2013 08:39 PM

The last time I spoke with Mike, I mentioned a Super Bowl time frame and he said "I certainly hope not!"

I wouldn't be surprised though, too many unknowns.

Dzel 12-17-2013 08:43 PM

Looks like you guys are one step closer! I seriously doubt that it will be summer

Sent with TapAhoe

DEpointfive0 12-17-2013 10:18 PM

Quote:

Originally Posted by BlkNismo (Post 2614459)
Thank you GTM for the long awaited update.

What is your projection of completion date? Summer of 14 or sooner?

:roflpuke2::bowrofl::roflpuke2:


All times are GMT -5. The time now is 01:01 AM.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2