05-31-2014, 09:23 AM
|
#1 (permalink)
|
|
A True Z Fanatic
Join Date: Aug 2011
Location: Ontario, Canada
Posts: 21,749
Drives: Varis Arising II
Rep Power: 51866
|
I'm procrastinating. He's my to-do list,
- Build and run two more oil lines
- Fill the oil
- Install intake pipes
- Install intercooler
- Wire up a relay and upgrade wiring to fuel pump
- Remove driver seat
- Wire in resistors for airbag delete
- Remove passenger side airbag seat pad thing and try to Macgyver a way to install it in the new seat
- Run wire for seat heaters, and wire it up
- Install harnesses
- Install seats
- Reinstall front bumper and undershroud
- Put the car back on the ground after inspecting for leaks
- clean inside and out
Oh, I have a couple pillars I need to work on too.
I think that's everything...
|
|
|