![]() |
Really enjoyed this journal, and the creativity here. Good stuff man! The DIY fabrication is awesome.
|
Speedy recovery Champ !
|
Quote:
I put brake pads and rotors on the wife's Grand Cherokee, and a belt and 2 idler pulleys on my Power Wagon this week. :icon14: Doing everything one handed sucks donkey balls. :shakes head: |
Quote:
|
Quote:
|
Quote:
|
1 Attachment(s)
Got some more work done today.
Got the bearings pressed on the OS Giken LSD carrier. :tup: |
6 Attachment(s)
Ran the oil pressure and water temp wiring from under the hood to the inside of the cabin.
1st, 2nd, and 3rd pic's. The hole I drilled out, then enlarged to 3/4" diameter. 4th pic. Rubber gromet and the wiring running through. 5th pic. Used clothes hanger to push wiring through the main wiring boot. 6th pic. Wiring through the main wiring boot. When I'm done wiring. I'l put some RTV over the slit that the wiring goes through to seal it. |
2 Attachment(s)
Remove the cubby hole for gauge install.
2nd pic shows how I will have the gauges layout. Across the top. Oil Pressure on the left and Water Temp on the right. Below the Water Temp will be the Diff Temp. To the left of the Diff Temp and below the Oil Pressure will be the switches to the diff oil pump, diff fan, YAW sensor, and dimmer for the gauge lights. |
Quote:
|
Nice work!!!:tup:
|
Quote:
|
Outstanding progress Mr. Rusty :tup:
|
5 Attachment(s)
Got some more work done on the gauges.
|
4 Attachment(s)
More pic's.
|
All times are GMT -5. The time now is 10:47 AM. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2