06-30-2013, 07:55 PM
|
#10 (permalink)
|
A True Z Fanatic
Join Date: Aug 2011
Location: Ontario, Canada
Posts: 21,749
Drives: Varis Arising II
Rep Power: 51865
|
Quote:
Originally Posted by LMBmikeZ
Running a couple wires for some new lights in the bedroom  it was probably realistically 4 hours total spent in the attic 6 hours to do all the lights in the two bedrooms.
Here's a crappy phone pic of what I had to crawl along. Blow these studs you see horizontal is a one foot gap to the real studs for the ceiling in the upstairs but those ones had nasty insulation yuk!
Took the pic while I took a lil 5 min rest to sit up instead of laying on my ribs and legs 
|
You couldn't have picked a hotter time to do that.  All done now?
|
|
|