Nissan 370Z Forum  

Long Lead Time for New Car Orders !!

Waiting even 3-4 months is ridiculous (let alone 8 months!) Some dealers have none of these things (their choice) and would like you to think that's just the way it

Go Back   Nissan 370Z Forum > Nissan 370Z General Area > Nissan 370Z Pricing / Ordering Discussions


Reply
 
LinkBack Thread Tools Display Modes
Old 04-24-2009, 12:56 PM   #1 (permalink)
Base Member
 
Join Date: Feb 2009
Location: Tucson, Az.
Posts: 42
Drives: 09 370Z
Rep Power: 18
wellarmed is on a distinguished road
Default

Waiting even 3-4 months is ridiculous (let alone 8 months!)
Some dealers have none of these things (their choice) and would like you to think that's just the way it is with these hard to get Zs... That's total BS.
Fontana Nissan in Calif is advertising $3000 off sticker on all '09 Zs and they have..... "26 available".

Catch a $59 redeye to LA and drive the thing home for cry'noutloud!

Last edited by wellarmed; 04-24-2009 at 01:01 PM.
wellarmed is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
EIBACH PRO KIT for NISSAN 370Z, taking pre-orders from AMPLIFIED MOTORSPORT LOU@AMPLIFIED Suspension/Brakes 20 04-07-2010 08:41 PM
First time owner - long time admirer ZCarGo New 370Z Owner 15 03-20-2009 02:25 PM


All times are GMT -5. The time now is 07:19 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2