Nissan 370Z Forum  

Long Lead Time for New Car Orders !!

I ordered one yesterday and was told 2 to 3 months delivery time from the factory. But it didn't sound very convincing, it was more like they quoted me a

Go Back   Nissan 370Z Forum > Nissan 370Z General Area > Nissan 370Z Pricing / Ordering Discussions


 
 
LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-24-2009, 09:09 AM   #8 (permalink)
JB1
Track Member
 
JB1's Avatar
 
Join Date: Mar 2009
Location: Chicagoland
Posts: 748
Drives: 09 Nissan 370Z sold
Rep Power: 19
JB1 has a spectacular aura aboutJB1 has a spectacular aura about
Default

I ordered one yesterday and was told 2 to 3 months delivery time from the factory. But it didn't sound very convincing, it was more like they quoted me a standard lead time, not Z specific. So I will call them regularly to check...
The problem for us in the states is that the Z is being introduced around Europe at this time as well, so I assume this will limit the propduction capacity for US spec cars. On the other hand, they are in crisis as well, so hopefully there will not be too many buyers out there
JB1 is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
EIBACH PRO KIT for NISSAN 370Z, taking pre-orders from AMPLIFIED MOTORSPORT LOU@AMPLIFIED Suspension/Brakes 20 04-07-2010 08:41 PM
First time owner - long time admirer ZCarGo New 370Z Owner 15 03-20-2009 02:25 PM


All times are GMT -5. The time now is 01:09 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2