02-19-2010, 09:36 PM
|
#10 (permalink)
|
|
Base Member
Join Date: May 2009
Location: PA
Posts: 57
Drives: g37
Rep Power: 18
|
Quote:
Originally Posted by SAM@GTM
I think we have showed a lot of info, pics and shared more then any other company that doing this type of work.Yes the process is slow, and i don't think it can be any faster, just sending the car to carb and going through the proses is a big undertaking. them add all the different a/r housing we offer. all different pulley it is a very time consuming work . but that's what it takes .
Sam
|
I was talking about the guy above me with the 10 pages in two days comment. Sorry about that.
|
|
|