Nissan 370Z Forum

Nissan 370Z Forum (http://www.the370z.com/)
-   Track / Autocross / Drifting / Dragstrip (http://www.the370z.com/track-autocross-drifting-dragstrip/)
-   -   CJM Fuel Starvation Control Product, Round 2 (http://www.the370z.com/track-autocross-drifting-dragstrip/75375-cjm-fuel-starvation-control-product-round-2-a.html)

SPOHN 09-03-2013 03:45 PM

Quote:

Originally Posted by phunk (Post 2471197)
BTW some more talk about the standalone version road race pump. This product would be a lot more costly and complex if it was required that I design it to work PnP with the OEM plumbing and returnless setup like the existing model does. I think that the extra cost of integrating an internal filter and regulator will probably almost match the cost of a return conversion anyway.

If I had the freedom to design the standalone version to only be compatible with our upcoming Stage 2 fuel system (or stage 3 in twin-pump configuration), it is something that I could get done much more quickly. Because it would require almost no changes to the road race sending unit itself.

So the most ideal candidate for a tester, would fit these circumstances:
A: Currently running our existing road race pump model.
B: Interested in upgrading to our Stage 2 fuel system (return conversion, billet rails, adjustable reg., upgraded lines, etc.) when available in a couple weeks.
C: Prepared for up to 10 days down time, to return the road race pump to us for a little reworking.

I would prefer the tester run it on the single 255 pump that is already in it, for initial testing. Integrating the secondary pump for a twin pump configuration would be an easy upgrade later.

I feel like I might have just described SPOHN perfectly :) Anyone else? There will be no cost for the changes to the road race pump. There would be a decent discount on the stage 2 kit for testing. The risk: it doesnt work well, and you have to put the road race pump back to how it was.

I would be interested. But my car has no motor in it. And wont for at least another month and that's not promising. Would that matter? If so even after I get it back together I'd still be interested unless the time frame for you won't work.

SPOHN 09-03-2013 03:47 PM

Quote:

Originally Posted by martin82 (Post 2471220)
Spohn! Lolll

Quote:

Originally Posted by Isamu (Post 2471555)
damn I wish i was a trust fund baby right now! lol

Phunk, I will be mssgin you here in the next couple of days.. I just got stateside and have alot of inprocessing to do, and after that my life will be some what normal

Don't hate

phunk 09-05-2013 10:56 PM

Website now configured to take the deposits!!!!

370z Road Race Fuel Pump

International Customers; our website doesnt accept international orders. Our direct PayPal address is sales at cj-motorsports.com

Btw, I don't want to get anyone too excited, but we might beat our deadline by a quite a bit!!!

clintfocus 09-05-2013 11:20 PM

what is the time frame you want the deposit in by? i wanted to get another check under my belt (next week friday) since ill be spending money on track this weekend

martin82 09-05-2013 11:26 PM

Putting my deposit in tomorrow!

phunk 09-06-2013 03:03 AM

Quote:

Originally Posted by clintfocus (Post 2475091)
what is the time frame you want the deposit in by? i wanted to get another check under my belt (next week friday) since ill be spending money on track this weekend

I was going for next Friday actually. It's not super firm, just a preference. At this point I am intending to order the rest of the material for building 20 of them. I've got 15 on the list.. Depending on how quickly others deposit and if other people decide to join in... It's hard to guess how it will go. I guess I'll say they are due next Friday but units will remain reserved for list members lets say an additional 10 days after that... Then the unit will be openly available. I hope that's fair. Not trying to pressure/rush anyone... Martin is the only one in a hurry :)

ChrisSlicks 09-06-2013 06:42 AM

Quote:

Originally Posted by phunk (Post 2475188)
Martin is the only one in a hurry :)

Are they ready yet? :p

mts 09-06-2013 06:58 AM

Shipping
 
Charles - I tried to put down my $150 deposit through paypal just now and the system wanted to charge me for shipping on the deposit. Is that the shipping charge for the eventual product or is it a mistake in the system right now?

Thanks,
Mike

phunk 09-06-2013 12:29 PM

I actually forgot to enable free shipping on the item, ill adjust that in a few minutes sorry

phunk 09-06-2013 12:52 PM

That error is fixed now!

clintfocus 09-06-2013 07:14 PM

Quote:

Originally Posted by phunk (Post 2475188)
I was going for next Friday actually. It's not super firm, just a preference. At this point I am intending to order the rest of the material for building 20 of them. I've got 15 on the list.. Depending on how quickly others deposit and if other people decide to join in... It's hard to guess how it will go. I guess I'll say they are due next Friday but units will remain reserved for list members lets say an additional 10 days after that... Then the unit will be openly available. I hope that's fair. Not trying to pressure/rush anyone... Martin is the only one in a hurry :)

well friday is fine, ill be paid direct deposit thursday night

phunk 09-06-2013 09:40 PM

Sign-up / Deposit as of 9/6:

1: ChrisSlicks
2: clintfocus
3: martin82
4: djtodd
5: M.Bonanni
6: KF365
7: FL 4Motion
8: Kdberan DEPOSIT PAID
9: mts
10: 2011 Nismo#91
11: nismo13807
12: SS_Firehawk
13: Ron
14: Coyote
15: Phone Order Guy

Rusty 09-07-2013 09:52 PM

2 Attachment(s)
For those who worry about the fuel pressure with this fuel pump kit. I have 65 lbs at an idle. :D I got this gauge set-up from phunk. :tiphat:

martin82 09-08-2013 01:55 AM

Been busy getting car ready for acs tomorrow ill process deposit on Monday!

KF365 09-09-2013 03:13 AM

Paid my deposit


All times are GMT -5. The time now is 09:58 AM.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2