View Single Post
Old 04-11-2009, 12:26 PM   #19 (permalink)
ozzfest
Base Member
 
Join Date: Nov 2008
Location: SOCAL
Posts: 53
Drives: 08' G35S 6MT/07' TL
Rep Power: 16
ozzfest is on a distinguished road
Send a message via Yahoo to ozzfest
Default

What the manual is referring to is the readiness monitors. These monitors are looked at when performing a smog inspection. Usually there are anywhere from 4 to 6 monitors. Out of those, all have to be "ready" except for 2 in order to pass an inspection. They will reach a "ready state" by just driving your vehicle normally over a period of 25 to 50 miles. Don't worry about it.
ozzfest is offline   Reply With Quote