Not yet, but Sam call's me every week, to give me an update.
was hoping to get it by mid march.
he's trying but to tell you guy's everything went wrong with the motor build.
we are now looking at a GTM wet sump set up.
I know exactly whats going on with the motor and I just have to wait.
Am I happy about this, absolutely not. My car has been sitting in my garage since June 2013.
there has been a lot of broken promises from GTM.
but over the last 10 years , every thing that ive bought from has been delivered. It just take 6 months to 2 years to get it from GTM.
That's how it works.
Its killing me that I have not been to the drag strip in 2 years.
Hopefully when I get he engine I can take the N/A time into the 11.8's before I put he SC on it.
Z
__________________
12.343 @114.14 . 4.5 stroker motor is now being built. Dec 1 2015.
Last edited by Z eliminator; 02-20-2015 at 08:03 AM.
|