View Single Post
Old 01-19-2014, 11:31 PM   #2704 (permalink)
Alkatraz
Base Member
 
Join Date: May 2013
Location: Perth
Posts: 215
Drives: 2008 Skyline 370GT
Rep Power: 12
Alkatraz is on a distinguished road
Default

Quote:
Originally Posted by SAM@GTM View Post
Not at all , powder coating usually takes four to five days so we still can do it if you want without causing any further delay . you still have time

Sam
I meant to send you guys an email about this ages ago. I had planned on getting a few things ceramic coated here in Perth before installation. Do you guys offer this as well or just powder coating?

Can't wait to get my hands on the installation manual so that I can start preparing. Is there much (if any) difference between the LHD and RHD installation process?
Alkatraz is offline