![]() |
Hi Mr.kenchan :hello:
I secured the top hats on my gauges and finished plumbing the waste gates. I only got 1/2 hour in the garage today. Tomorrow is project work. :ugh: |
OK now I'm bored. :o
|
hamburgers for dinner!!! :yum:
|
Quote:
|
Quote:
|
Quote:
Mr.gurneyeagle, glad to hear everything works out as planned..!! Quote:
|
Quote:
|
Quote:
Quote:
BTW mr. Gale - I saw your build thread last night, and I am very impressed sir! :tup: |
Quote:
|
Quote:
|
:hello:
Finally sat down. Have not eaten since breakfast... A short glass of Gentleman Jack is in front of me, I'm probably going to be about half-crocked in 15 minutes. :) Things turned out pretty well thus far, I think we can have 3" cut off the stringers and patch in some good hardwood and we'll be OK. I'd like to do something more moisture-proof, I'm going to ask my guy if maybe it would be possible to pour a final stair of concrete for the remains of the stringers to rest on. We have done a lot to keep our basement dry, but at times the water table gets so high it just comes up through every crack in the floor. However the damage there currently is from years of the washer overflowing/gutters not being adequate, etc. Back at it tomorrow, but it's coming along. |
Yo :hello:
|
I'm hungry.
|
Quote:
|
Quote:
Sent from my SAMSUNG-SGH-I747 using Tapatalk 2 |
All times are GMT -5. The time now is 06:28 AM. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2